Cikopo MHPP project is a run-of-river hydropower plant located in Garut, West Java - approximately 220 km from Jakarta, Indonesia. The site is fully operational as of March 2017 with an installed capacity of 7.4 MW and an estimated annual energy output of 52,000 MWh.
The majority of the Cikopo catchment area is located within a protected forest, allowing for more stable discharge throughout the year. The design discharge is 3.2 m3/sec with 264 m net head. The elevation of the weir is 1,154 meters above sea level and the diverted water is then channeled along an open canal for 1,520 meters to a forebay tank before entering 960 meters of the penstock. Two units of Wasserkraft Volk AG Pelton turbines are used for this power plant.